Site Visit: Checking The Drops

As part of any project, I am a big proponent of having a hands-on approach, and in this case an onsite approach.


I asked the client to let me know whenever they have a site visit and meeting with the general contractor so I can stay in the loop. When the topics have nothing to do with me, I use the opportunity to walk the site, take photos and make notes.


In this video short, I notice that there is only one cable pulled where there should have been 2 and was able to let the cabling contractor know.  a change like that later would take much more time and money to address and fix.